December 14, 2009

“SCHEME L” FOR THE WIN.

After several weeks of back and forths, iterations and discussions about light, windows, where to store stuff and how to use the space, we’ve settled on Scheme L.  The 12th round of plans, we’re locking on this and moving forward.  Here’s a little taste of what we are looking towards:

 

3D concept of the front of the house (click to enlarge).

image 

 

3D concepts of the back of the house (click to enlarge).

image   image 

 

Floorplan (click to enlarge).

 image

December 6, 2009

PIC OF THE WEEK.

Who doesn’t love a little pineapple wallpaper?

December 4, 2009

FANCY A COCKTAIL?

Since we’re quickly going to be swinging the wrecking ball and starting the demolition (and eventually the reconstruction) of the house, we thought we should have people over for drinks.  If you are around on Sunday, December 13th between 2:00 and 5:00, swing by for a drink and some chuckles at the wallpaper.  Kids and friends welcome!

December 3, 2009

HERE COME THE SCHEMATICS!

We’ve started receiving the first round of schematic designs from Anna.  She did 5 initial design concepts and is now editing like mad.

house frontas-built schematic 

Lots of cool thinking around redesigning the kitchen and dining areas, the upstairs bedrooms and the office space.  Next up is to finalize on one concept and start refining it to get it just right.

We’ll post some of the deigns after we start to gel on one direction.